Water News - Page 19 of 19 - Delta Water

Delta Water Water News

DELTA solves calcium build-up in nursing home

Posted on December 15, 2009 in Case Studies

Calcium build-up on pressure-release and mixer valves on hot-water systems was a problem at Orana Gardens Retirement Village. That was until a trial with the 100% Australian made DELTA water treatment technology. The home has about 90 hot-water systems that required a six-monthly plumbing service. Installation of the DELTAwater solutions water treatment technology has reduced…


Read more

Calcium Scale Build Up – DELTA Keeps Evaporative Cooling Pads Clean

Posted on November 15, 2009 in Case Studies

A trial using the DELTA water treatment technology to eliminate heavy calcium scale build-up on evaporative cooling pads in Queensland has proved a major success. A DELTA CU40 unit, installed on PVC pipe carrying water from a pump to the pads, has dramatically improved conditions for an Inghams contract grower at Beaudesert. Scale had built…


Read more

Abattoir scale solution

Posted on August 15, 2009 in Case Studies

A Casino abattoir is saving money on maintenance as a result of installing the DELTA water treatment technology. The abattoir called on DELTAwater solutions to find a solution for the build-up of scale in heat exchangers. Every fortnight, staff had to disassemble the exchangers for cleaning which was both costly and time-consuming. Installation of the…


Read more

Gold mine in Western Australia

Posted on June 14, 2009 in Case Studies

The installation of the DELTA water treatment technology has proven a major bonus for a gold mine in Western Australia. After only three days of dewatering the mine there was a considerable build-up of salt in a poly pipe. To clear blockages, maintenance crews needed to use sledge hammers on the outside of the pipes…


Read more

Delta solution for cotton research facility

Posted on May 15, 2009 in Case Studies

Six months of water treatment with a DELTA CU40 unit has led to major cost-savings for Deltapine Cotton Research Facility in Narrabri, NSW. The DELTA technology has eliminated calcium scale and algal growth from 50 metres of cooling pads along the full length of a glasshouse wall. Two sumps each supplied water to 25 metres…


Read more